Engineering


Projects Under Construction

There are currently no construction projects being managed by the department. Recently constructed projects include the Suber Road Sidewalk (near Hammett Crossing, approx. $50,000) and the Bent Creek Development Street Rehab and Paving (substantially complete, approx. $200,000).

Projects Under Design

The design of the following T.I.F. projects is under contract to an engineering consultant, Davis and Floyd, Inc., and is being coordinated by the department:

  • Lorla Street Reconstruction - from Hampton Road to Elmer Street (approx. $300,000 to $400,000).
  • Chick Springs Road Reconstruction - from Dill Street to Suber Road (approx. $700,000 to $800,000).

The Victor Road Culvert Extension project is currently being designed in-house. See Drainage Projects for more information (approx. $30,000 to $60,000).

 

 

New Resolution

Resolution Number 11-2004

A Resolution of the City of Greer, South Carolina Authorizing Increases in Planning and Zoning Fees; Engineering and Stormwater Management Review and Inspection Fees; Building Permit Fees; Electrical Permit Fees; Plumbing Permit Fees; and Mechanical Permit Fees.

This resolution shall become effective on July 1, 2004.

Steps for Submitting Engineering/Stormwater Fee to the City

  1. Include total acreage and linear feet of roadway in your submission to Planning and Zoning for the ARC meeting.
  2. At ARC meeting, you will receive a completed Review/Inspection Fee Form              (see example) showing your fee with the total acreage and linear feet of roadway.
  3. Submit the Review/Inspection Fee Form, the appropriate fee, and completed set of plans for review to City Hall.
  4. At City Hall, an administrative employee will take your signed and dated form, sign it as received and give you a copy for your records.
  5. Should the total acreage or linear feet of roadway change, please inform City Engineer or Storm Water Director before submission of plans.